Image TileImage TileImage TileImage TileImage TileImage TileImage TileImage TileImage TileImage TileImage TileImage TileImage TileImage TileImage TileImage TileImage TileImage TileImage TileImage TileImage TileImage TileImage TileImage Tile
Image size: 5632x6656 Scale: 35% - PanoJS3
Page overview thumbnail

Article text

PLANT FOR ZARA
STREET
New Turbo-Alternator
INCREASE OUTPUT BY THIRD
A turbo-alternato r which will increase
the output of electricity from Zara-streel
power-house by 30 to 40 per cent., reached
wweastle from England by the Enranmee
yesterday. It is expected that the plaSt.
which weighs 150 tons, will be ill opera.
tion is foar monrthis.
The two alternators. the largest sections
of the nmcilne swhich arrired in cases,
Irere unloaded from the Karamnen. by the
llroadoscadow raiwa,- breakdown crane.
aald placed on trucks at Lee Wharf. Each .
alternator, weighillg 20 tons, will be an.
loaded from the tracko at athe power
hoose to-de, or on Mlonday.
The nesr plant comprises pnrt of the
extension of tile poser-hollse made neces
sury ha- the increased demand. Two boilern
are being, erected in the new bhilding, nnd
wFhen completed aill comprise the nd
litiousl .generating equipment arith the
turbo-alternator.
$