Image TileImage TileImage TileImage TileImage TileImage TileImage TileImage TileImage TileImage TileImage TileImage TileImage TileImage TileImage TileImage TileImage TileImage TileImage TileImage TileImage TileImage TileImage TileImage Tile
Image size: 6656x8704 Scale: 35% - PanoJS3
Page overview thumbnail

Article text

AFTER THE DUST STORM.
At the last meeting of the Dunmunkle
Council the matter of the clearing of the
channels was brought under notice by the
engineer. After a lengthy discussion a
resolution was passed to have applications
called for teams to do 'this work at 3d per
cubic yard, and the lengths to be let in lots
of 2000 yards. Altogether there are
104,000 cubic yards of drift to be removed,
and the engineer estimate® the work to be
finished in eight weeks.
$