Articles from page 3: Previous page Next page

  1. Please wait. Loading browse data... loading
  2. Chichester River Gravitation Scheme N.S.W.

    An abstract of paper read before the N.S.W. Members of the Institute of Engineers. ...

    Article : 26 words
  3. Advertising

    {No abstract available}

    Advertising : 377 words
  4. Advertising

    {No abstract available}

    Advertising : 131 words
  5. (Reprinted from the Commonwealth "Engineer," August. 1924.)

    The Hunter river district of New South Wales obtains its water supply from a pumping plant at Walka, near Maitland, and this supply ...

    Article : 736 words
  6. RIVER DIVERSION.

    In order to get at the foundations in the existing river bed, it was first necessary to divert the river. A concrete retaining wall was first ...

    Article : 189 words
  7. CONSTRUCTION OF THE WALL.

    The preliminary work in connection with the construction of the dam was started in 1916. The site of the dam was cleared and a start ...

    Article : 924 words
  8. CONCRETING.

    In October, 1920, on account of the shortage of cement, work on the dam was stopped, and was not recommenced until August, 1922 ...

    Article : 364 words
  9. THE VILLAGE AREA.

    The camping area for the employees is on a site immediately off tho catchment area. The comfort, and health of the construction village ...

    Article : 143 words
  10. DESIGN.

    The Chichester dam is designed upon a gravity section curved in plan with a radius of 1200ft. at the up-stream face. The shallow ...

    Article : 403 words
  11. Advertising

    {No abstract available}

    Advertising : 103 words
×

Buy

Download

Please choose from the following download options:

Share

Share this item on:

Print

Print page as...

The National Library of Australia's Copies Direct service lets you purchase higher quality, larger sized photocopies or electronic copies of newspapers pages.

Scope
Format of download
as... PDF PDF

You need to login before you can save preferences.

$